|
|
Switch Contact Blocks / Switch Kits AUXILIARY CONTACTS BG 4NO 11-BGX10-40
Banner Engineering 11-BGX10-40
- 11-BGX10-40
- Banner Engineering
-
1:
₹4,312.32
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-11-BGX10-40
|
Banner Engineering
|
Switch Contact Blocks / Switch Kits AUXILIARY CONTACTS BG 4NO 11-BGX10-40
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings SUPPRESSOR BG less than or equal to 48 V DC
Banner Engineering 11-BGX77-048
- 11-BGX77-048
- Banner Engineering
-
1:
₹2,156.16
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-11-BGX77-048
|
Banner Engineering
|
Switch Fixings SUPPRESSOR BG less than or equal to 48 V DC
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Contact Blocks / Switch Kits AUXILIARY CONTACTS BF 3NO 11-G484-30
Banner Engineering 11-G484-30
- 11-G484-30
- Banner Engineering
-
1:
₹4,132.64
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-11-G484-30
|
Banner Engineering
|
Switch Contact Blocks / Switch Kits AUXILIARY CONTACTS BF 3NO 11-G484-30
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings ESTOP 8-LM2T-AU115 BTN LEGEND 8-LM2T-AU115 - (EMERGENCY STOP)
Banner Engineering 8-LM2T-AU115
- 8-LM2T-AU115
- Banner Engineering
-
1:
₹1,347.60
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-8-LM2T-AU115
|
Banner Engineering
|
Switch Fixings ESTOP 8-LM2T-AU115 BTN LEGEND 8-LM2T-AU115 - (EMERGENCY STOP)
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings BMHL4G WINDOW SINGLE PACK YEL
Banner Engineering BMHL4G
- BMHL4G
- Banner Engineering
-
1:
₹2,90,093.36
-
Non-Stocked Lead-Time 6 Weeks
|
Mouser Part No
778-BMHL4G
|
Banner Engineering
|
Switch Fixings BMHL4G WINDOW SINGLE PACK YEL
|
|
Non-Stocked Lead-Time 6 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings BMHL4GSS HEATED WINDOW YELLOW 4 FT ARRAY
Banner Engineering BMHL4GSS
- BMHL4GSS
- Banner Engineering
-
1:
₹3,39,774.88
-
Non-Stocked Lead-Time 8 Weeks
|
Mouser Part No
778-BMHL4GSS
|
Banner Engineering
|
Switch Fixings BMHL4GSS HEATED WINDOW YELLOW 4 FT ARRAY
|
|
Non-Stocked Lead-Time 8 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings BMHL5G WINDOW SINGLE PACK YEL
Banner Engineering BMHL5G
- BMHL5G
- Banner Engineering
-
1:
₹3,42,739.60
-
Non-Stocked Lead-Time 9 Weeks
|
Mouser Part No
778-BMHL5G
|
Banner Engineering
|
Switch Fixings BMHL5G WINDOW SINGLE PACK YEL
|
|
Non-Stocked Lead-Time 9 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings BMHL6G WINDOW YELLOW
Banner Engineering BMHL6G
- BMHL6G
- Banner Engineering
-
1:
₹3,83,526.96
-
Non-Stocked Lead-Time 6 Weeks
|
Mouser Part No
778-BMHL6G
|
Banner Engineering
|
Switch Fixings BMHL6G WINDOW YELLOW
|
|
Non-Stocked Lead-Time 6 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings Surface Mount Dome Housing GEN 2
Banner Engineering BWA-HSG-MGS-003
- BWA-HSG-MGS-003
- Banner Engineering
-
1:
₹6,288.80
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-BWA-HSG-MGS-003
|
Banner Engineering
|
Switch Fixings Surface Mount Dome Housing GEN 2
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings M12 12-Pin Prewired; 1/2-14 in NBSM
Banner Engineering BWA-QD12.5
- BWA-QD12.5
- Banner Engineering
-
1:
₹2,695.20
-
Non-Stocked Lead-Time 3 Weeks
|
Mouser Part No
778-BWA-QD12.5
|
Banner Engineering
|
Switch Fixings M12 12-Pin Prewired; 1/2-14 in NBSM
|
|
Non-Stocked Lead-Time 3 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings 8-pin M12 Prewired; 1/2-14 in NBSM
Banner Engineering BWA-QD8.5
- BWA-QD8.5
- Banner Engineering
-
1:
₹1,886.64
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-BWA-QD8.5
|
Banner Engineering
|
Switch Fixings 8-pin M12 Prewired; 1/2-14 in NBSM
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings Emergency Stop Legend Label (adhesive backed); English - Mexican Spanish; 60 mm OD, 41 mm hole, Use with SSA-EB1 40 mm and SSA-EB2 60 mm Actuators; Qty 10
Banner Engineering ESL-41/60-ENMX-10
- ESL-41/60-ENMX-10
- Banner Engineering
-
1:
₹5,911.47
-
Non-Stocked Lead-Time 4 Weeks
-
New At Mouser
|
Mouser Part No
778-ESL41/60-ENMX-10
New At Mouser
|
Banner Engineering
|
Switch Fixings Emergency Stop Legend Label (adhesive backed); English - Mexican Spanish; 60 mm OD, 41 mm hole, Use with SSA-EB1 40 mm and SSA-EB2 60 mm Actuators; Qty 10
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Label
|
|
Emergency Stop
|
|
|
|
|
|
Switch Cases / Switch Covers EZA-ADE-1 EZS ACCESSORY ACCESS DOOR EMITTER
Banner Engineering EZA-ADE-1
- EZA-ADE-1
- Banner Engineering
-
1:
₹1,706.96
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-EZA-ADE-1
|
Banner Engineering
|
Switch Cases / Switch Covers EZA-ADE-1 EZS ACCESSORY ACCESS DOOR EMITTER
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Covers
|
|
Mechanical Switches
|
|
|
|
|
|
Switch Cases / Switch Covers EZA-ADE-2 EZS ACCESSORY ACCESS DOOR INVERT DISPLAY E
Banner Engineering EZA-ADE-2
- EZA-ADE-2
- Banner Engineering
-
1:
₹1,886.64
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-EZA-ADE-2
|
Banner Engineering
|
Switch Cases / Switch Covers EZA-ADE-2 EZS ACCESSORY ACCESS DOOR INVERT DISPLAY E
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Covers
|
|
Mechanical Switches
|
|
|
|
|
|
Switch Cases / Switch Covers EZA-ADE-4 EZS ACCESSORY INVERT ACCESS DOOR E LOW ESD
Banner Engineering EZA-ADE-4
- EZA-ADE-4
- Banner Engineering
-
1:
₹5,300.56
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-EZA-ADE-4
|
Banner Engineering
|
Switch Cases / Switch Covers EZA-ADE-4 EZS ACCESSORY INVERT ACCESS DOOR E LOW ESD
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Cases / Switch Covers EZA-ADR-1 EZ-SCREEN ACCESSORY ACCESS DOOR RECEIVER
Banner Engineering EZA-ADR-1
- EZA-ADR-1
- Banner Engineering
-
1:
₹1,706.96
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-EZA-ADR-1
|
Banner Engineering
|
Switch Cases / Switch Covers EZA-ADR-1 EZ-SCREEN ACCESSORY ACCESS DOOR RECEIVER
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Covers
|
|
Mechanical Switches
|
|
|
|
|
|
Switch Cases / Switch Covers EZA-ADR-4 EZ-SCREEN ACCESSORY INVERT ACCESS DOOR R LOW ESD
Banner Engineering EZA-ADR-4
- EZA-ADR-4
- Banner Engineering
-
1:
₹5,300.56
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-EZA-ADR-4
|
Banner Engineering
|
Switch Cases / Switch Covers EZA-ADR-4 EZ-SCREEN ACCESSORY INVERT ACCESS DOOR R LOW ESD
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings EZA-RR-1 EZ SCREEN ACCESSORY REMOTE RESET KEY BOX
Banner Engineering EZA-RR-1
- EZA-RR-1
- Banner Engineering
-
1:
₹24,346.64
-
Non-Stocked Lead-Time 3 Weeks
|
Mouser Part No
778-EZA-RR-1
|
Banner Engineering
|
Switch Fixings EZA-RR-1 EZ SCREEN ACCESSORY REMOTE RESET KEY BOX
|
|
Non-Stocked Lead-Time 3 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings EZA-RTP-1 EZ SCREEN ACCESSORY JUMPER ASSY
Banner Engineering EZA-RTP-1
- EZA-RTP-1
- Banner Engineering
-
1:
₹2,335.84
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-EZA-RTP-1
|
Banner Engineering
|
Switch Fixings EZA-RTP-1 EZ SCREEN ACCESSORY JUMPER ASSY
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings EZA-SW-1 EZ SCREEN ACCESSORY SPANNER WRENCH
Banner Engineering EZA-SW-1
- EZA-SW-1
- Banner Engineering
-
1:
₹898.40
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-EZA-SW-1
|
Banner Engineering
|
Switch Fixings EZA-SW-1 EZ SCREEN ACCESSORY SPANNER WRENCH
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings iVu Window spare parts kit; Glass Window; includes window, locking clip, screw; and O-ring
Banner Engineering IVUW-G
- IVUW-G
- Banner Engineering
-
1:
₹8,085.60
-
Non-Stocked Lead-Time 6 Weeks
|
Mouser Part No
778-IVUW-G
|
Banner Engineering
|
Switch Fixings iVu Window spare parts kit; Glass Window; includes window, locking clip, screw; and O-ring
|
|
Non-Stocked Lead-Time 6 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings K50 Key Switch Spare Keys; 5 Pack; A126 Key
Banner Engineering ACC-K50-SPARE A126 KEY 5 KEYS
- ACC-K50-SPARE A126 KEY 5 KEYS
- Banner Engineering
-
1:
₹1,617.12
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-KSPRA126KEY5KEYS
|
Banner Engineering
|
Switch Fixings K50 Key Switch Spare Keys; 5 Pack; A126 Key
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings 2 Replacement Keys; Used With: EZAC boxes and MGA-KSO-1 Key Switch Assembly
Banner Engineering MGA-K-1
- MGA-K-1
- Banner Engineering
-
1:
₹4,581.84
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-MGA-K-1
|
Banner Engineering
|
Switch Fixings 2 Replacement Keys; Used With: EZAC boxes and MGA-KSO-1 Key Switch Assembly
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings Accessory: Hardware Packet Mini-Screen; Vibration Mount; Banner part number 119224
Banner Engineering MSA-119224
- MSA-119224
- Banner Engineering
-
1:
₹1,617.12
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-MSA-119224
|
Banner Engineering
|
Switch Fixings Accessory: Hardware Packet Mini-Screen; Vibration Mount; Banner part number 119224
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|
|
|
Switch Fixings OS-8 OCTAL SCKT
Banner Engineering OS-8
- OS-8
- Banner Engineering
-
1:
₹1,976.48
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-OS-8
|
Banner Engineering
|
Switch Fixings OS-8 OCTAL SCKT
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
|
|