Results: 450
Select Image Part # Mfr. Description Datasheet Availability Pricing (INR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
TE Connectivity / Alcoswitch Basic / Snap Action Switches MINSA SW HLV 0.30N 0.5A AC SC sh-L-Bnd
Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

TE Connectivity / Alcoswitch Basic / Snap Action Switches MINSA SW HLV 0.30N 0.5A AC NC sh-L-Bnd
Non-Stocked Lead-Time 10 Weeks
Min.: 1,000
Mult.: 500

TE Connectivity / Alcoswitch Basic / Snap Action Switches MINSA SW HLV 0.30N 0.5A AC NO sh-L-Bnd
Non-Stocked Lead-Time 10 Weeks
Min.: 1,000
Mult.: 500

TE Connectivity / Alcoswitch Basic / Snap Action Switches MINSA SW HLV 0.30N 0.5A AC SC Lg-L-Bnd
Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

TE Connectivity / Alcoswitch Basic / Snap Action Switches MINSA SW HLV 0.30N 0.5A AC NC Lg-L-Bnd
Non-Stocked Lead-Time 10 Weeks
Min.: 1,000
Mult.: 500

TE Connectivity / Alcoswitch Basic / Snap Action Switches MINSA SW HLV 0.30N 0.5A AC NO Lg-L-Bnd
Non-Stocked Lead-Time 10 Weeks
Min.: 1,000
Mult.: 500

TE Connectivity / Alcoswitch Basic / Snap Action Switches MUSA SW PPL Std 3A VACDT A LeadWCon SLD
Non-Stocked Lead-Time 10 Weeks
Min.: 1,000
Mult.: 200

TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINAS SW PPL 1.8N. 2A DT PCB UP SLD
Non-Stocked Lead-Time 10 Weeks
Min.: 1,000
Mult.: 100

TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINAS SW PPL 1.8N. 2A DT QC110 SLD
Non-Stocked Lead-Time 10 Weeks
Min.: 1,000
Mult.: 100

TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINAS SW PPL 1.8N. 2A DT SLD
Non-Stocked Lead-Time 10 Weeks
Min.: 1,000
Mult.: 100

TE Connectivity Basic / Snap Action Switches Micro Switch MZT1 361 305
Non-Stocked Lead-Time 15 Weeks
Min.: 200
Mult.: 200
C&K Interlock Switches SWITCH DOOR INTERLOCK SPDT QC
Non-Stocked Lead-Time 15 Weeks
Min.: 1
Mult.: 1

C&K Interlock Switches Snap
Non-Stocked Lead-Time 15 Weeks
Min.: 250
Mult.: 25

C&K Interlock Switches SPDT 15A SCREW TERM.
Non-Stocked Lead-Time 15 Weeks
Min.: 1
Mult.: 1

C&K Interlock Switches Snap
Non-Stocked Lead-Time 15 Weeks
Min.: 200
Mult.: 20

C&K Interlock Switches 2 DOOR INTERLOCK SW
Non-Stocked
Min.: 50
Mult.: 1

C&K Interlock Switches SPDT 15A SCREW TERM.
Lead-Time 15 Weeks
Min.: 1
Mult.: 1

C&K Basic / Snap Action Switches Snap
Non-Stocked Lead-Time 31 Weeks
Min.: 119
Mult.: 1

C&K Basic / Snap Action Switches Snap
Non-Stocked Lead-Time 31 Weeks
Min.: 119
Mult.: 119

C&K Basic / Snap Action Switches Snap
Non-Stocked Lead-Time 29 Weeks
Min.: 100
Mult.: 100

C&K Basic / Snap Action Switches Snap
Non-Stocked Lead-Time 29 Weeks
Min.: 250
Mult.: 250

C&K Basic / Snap Action Switches DPDT 15A .250" QC
Non-Stocked Lead-Time 29 Weeks
Min.: 250
Mult.: 25

C&K Basic / Snap Action Switches Snap
Non-Stocked
Min.: 150
Mult.: 1

C&K Basic / Snap Action Switches Snap
Non-Stocked Lead-Time 29 Weeks
Min.: 150
Mult.: 25

C&K Basic / Snap Action Switches Snap
Non-Stocked Lead-Time 29 Weeks
Min.: 250
Mult.: 25