|
|
Fibre Optic Cable Assemblies SHEATH PFS44S6T FIELD-INSTALL SS 4.4 MM O.D. 6 FT LONG
Banner Engineering PFS44S6T
- PFS44S6T
- Banner Engineering
-
1:
₹6,401.18
-
1In Stock
|
Mouser Part No
778-PFS44S6T
|
Banner Engineering
|
Fibre Optic Cable Assemblies SHEATH PFS44S6T FIELD-INSTALL SS 4.4 MM O.D. 6 FT LONG
This item may require additional import fees and documentation. Customs delays may also occur.
|
|
1In Stock
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
Fibre Optic Cable Assemblies Field Repair Part; MiniAarray; CAP END CONN EMTR ASSY 2-ST MA; 8-pin QD Pigtail
Banner Engineering FRP-MA-QE8
- FRP-MA-QE8
- Banner Engineering
-
1:
₹18,630.30
-
Non-Stocked Lead-Time 6 Weeks
|
Mouser Part No
778-FRP-MA-QE8
|
Banner Engineering
|
Fibre Optic Cable Assemblies Field Repair Part; MiniAarray; CAP END CONN EMTR ASSY 2-ST MA; 8-pin QD Pigtail
This item may require additional import fees and documentation. Customs delays may also occur.
|
|
Non-Stocked Lead-Time 6 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
Fibre Optic Cable Assemblies Field Repair Part; MiniAarray; CAP END CONN RCVR ASSY 2-ST MA; 8-pin QD Pigtail
Banner Engineering FRP-MA-QR8
- FRP-MA-QR8
- Banner Engineering
-
1:
₹17,579.36
-
Non-Stocked Lead-Time 6 Weeks
|
Mouser Part No
778-FRP-MA-QR8
|
Banner Engineering
|
Fibre Optic Cable Assemblies Field Repair Part; MiniAarray; CAP END CONN RCVR ASSY 2-ST MA; 8-pin QD Pigtail
This item may require additional import fees and documentation. Customs delays may also occur.
|
|
Non-Stocked Lead-Time 6 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
Fibre Optic Cable Assemblies SHEATH PFS69S30 FIELD-INSTALL SS 6.9 MM O.D. 30 FT LONG
Banner Engineering PFS69S30
- PFS69S30
- Banner Engineering
-
1:
₹20,445.56
-
Non-Stocked Lead-Time 5 Weeks
|
Mouser Part No
778-PFS69S30
|
Banner Engineering
|
Fibre Optic Cable Assemblies SHEATH PFS69S30 FIELD-INSTALL SS 6.9 MM O.D. 30 FT LONG
This item may require additional import fees and documentation. Customs delays may also occur.
|
|
Non-Stocked Lead-Time 5 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
Fibre Optic Cable Assemblies Accessory: Sheath PFS69S6T Field-Install Stainless Steel 6.9 mm; O.D. 30 ft Long
Banner Engineering PFS69S30T
- PFS69S30T
- Banner Engineering
-
1:
₹13,853.30
-
Non-Stocked Lead-Time 5 Weeks
|
Mouser Part No
778-PFS69S30T
|
Banner Engineering
|
Fibre Optic Cable Assemblies Accessory: Sheath PFS69S6T Field-Install Stainless Steel 6.9 mm; O.D. 30 ft Long
This item may require additional import fees and documentation. Customs delays may also occur.
|
|
Non-Stocked Lead-Time 5 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
Fibre Optic Cable Assemblies Opposed Mode Individual Glass Fiber Adapter, Patch Cable Assembly; 0.2 m Long PVC over Monocoil Jacket; 1.5 mm dia. Bundle For use with Plastic Fiber Sensors to interface large Bundle Glass Fiber Assemblies. These are sold in pairs
Banner Engineering PGFA1.7T5
- PGFA1.7T5
- Banner Engineering
-
1:
₹51,496.06
-
Non-Stocked Lead-Time 6 Weeks
|
Mouser Part No
778-PGFA1.7T5
|
Banner Engineering
|
Fibre Optic Cable Assemblies Opposed Mode Individual Glass Fiber Adapter, Patch Cable Assembly; 0.2 m Long PVC over Monocoil Jacket; 1.5 mm dia. Bundle For use with Plastic Fiber Sensors to interface large Bundle Glass Fiber Assemblies. These are sold in pairs
This item may require additional import fees and documentation. Customs delays may also occur.
|
|
Non-Stocked Lead-Time 6 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
|
Fibre Optic Cable Assemblies Plastic Fiber Group: Opposed Mode; Coupled 5 m 1.5 mm Core Diameter Plastic Fiber; Free Cut; For use with all PGIR assemblies as a replacement or for added length; Package Contains One Cable
Banner Engineering PGIR-LF-5M
- PGIR-LF-5M
- Banner Engineering
-
1:
₹5,159.16
-
Non-Stocked Lead-Time 9 Weeks
|
Mouser Part No
778-PGIR-LF-5M
|
Banner Engineering
|
Fibre Optic Cable Assemblies Plastic Fiber Group: Opposed Mode; Coupled 5 m 1.5 mm Core Diameter Plastic Fiber; Free Cut; For use with all PGIR assemblies as a replacement or for added length; Package Contains One Cable
This item may require additional import fees and documentation. Customs delays may also occur.
|
|
Non-Stocked Lead-Time 9 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|