Texas Instruments TAS2020EVM Evaluation Module

Texas Instruments TAS2020EVM Evaluation Module demonstrates the performance of TAS2020 in a mono configuration. The TAS2020EVM utilizes the AC-MB to supply a USB-to-Audio interface to the evaluation module. Up to four devices can share a common bus via I2S/TDM and I2C interfaces. Additionally, the TI TAS2020EVM supports a dual mono configuration by merging two TAS2020EVMs.

Features

  • Mono speaker evaluation
  • Plug-n-play hardware mode
  • Advanced software mode interface using PurePath™ Console 3 Windows® software
  • EVM interconnection for stereo testing
  • USB input
  • External I2C and I2S/TDM host controller connection available

Applications

  • Mobile phones, tablets, and wearables
  • Smart speakers with voice assistance
  • Bluetooth and wireless speakers

Kit Contents

  • TAS2020EVM
  • AC-MB controller board

TAS2020 Mono Evaluation Module

Texas Instruments TAS2020EVM Evaluation Module

Application Diagram for 1S Battery System

Application Circuit Diagram - Texas Instruments TAS2020EVM Evaluation Module

Layout

Texas Instruments TAS2020EVM Evaluation Module
Published: 2025-10-14 | Updated: 2025-10-27